Streamflow
Yields in the North Platte River drainage will be well below normal. Irrigators diverting water directly from a stream
may experience water shortages. All the following yields are based on the fifty- percent chance June through
September yield. Yield for the North Platte River near Northgate is expected to be about 89,000 acre-feet (56 percent
of average). Encampment River near Encampment is estimated to yield 66,000 acre-feet (64 percent of normal). Rock
Creek near Arlington is estimated to yield 20,000 acre-feet (48 percent of average). Seminoe Reservoir inflow should be
about (280,000 acre-feet (57 percent of normal). See the following table for more detailed information on projected
runoff.
==================================================================================================================================
UPPER NORTH PLATTE RIVER BASIN
Streamflow Forecasts - June 1, 2001
==================================================================================================================================
| <<====== Drier ====== Future Conditions ======= Wetter =====>> |
| |
Forecast Point Forecast | ==================== Chance Of Exceeding * ====================== |
Period | 90% 70% | 50% (Most Probable) | 30% 10% | 30-Yr Avg.
| (1000AF) (1000AF) | (1000AF) (% AVG.) | (1000AF) (1000AF) | (1000AF)
====================================================================|=======================|=====================================
North Platte River nr Northgate JUN-SEP 56 76 | 89 56 | 102 122 158
| |
Encampment River nr Encampment JUN-SEP 50 60 | 66 64 | 79 97 103
| |
Rock Creek nr Arlington JUN-SEP 17.2 18.8 | 20 48 | 21 23 42
| |
Seminoe Reservoir inflow JUN-JUL 134 197 | 240 56 | 283 346 428
JUN-SEP 203 249 | 280 57 | 311 357 491
| |
==================================================================================================================================
UPPER NORTH PLATTE RIVER BASIN | UPPER NORTH PLATTE RIVER BASIN
Reservoir Storage (1000 AF) - End of May | Watershed Snowpack Analysis - June 1, 2001
==================================================================================================================================
Usable | *** Usable Storage *** | Number This Year as % of
Reservoir Capacity| This Last | Watershed of =================
| Year Year Avg | Data Sites Last Yr Average
========================================================================|=========================================================
SEMINOE 1016.7 751.1 914.2 551.0 | N PLATTE above Northgate 5 64 28
|
| ENCAMPMENT RIVER 3 95 27
|
| BRUSH CREEK 2 74 32
|
| MEDICINE BOW & ROCK CREEK 2 114 34
|
| N PLATTE above Seminoe 13 80 29
|
==================================================================================================================================
* 90%, 70%, 30%, and 10% chances of exceeding are the probabilities that the actual volume will exceed the volumes in the table.
The average is computed for the 1961-1990 base period.
(1) - The values listed under the 10% and 90% Chance of Exceeding are actually 5% and 95% exceedance levels.
(2) - The value is natural volume - actual volume may be affected by upstream water management.
To June 2001 Basin Outlook Report Contents Page