Precipitation
Reservoir
Streamflow
The following runoff values are for the 50 percent probability during
the June through September forecast period. The estimated yield for
Tongue River near Dayton is 70,000 acre-feet (91 percent of normal).
Water users on the Middle Fork near Barnum should have a yield near
8,250 acre-feet (104 percent of normal). The North Fork of the Powder
near Hazelton should yield about 7,300 acre-feet (122 percent of
normal). The estimated yield for Clear Creek near Buffalo is 32,000
acre-feet (114 percent of average). Rock Creek near Buffalo will
yield about 19,300 acre-feet (115 percent of normal), and Piney Creek
at Kearny should yield about 36,700 acre-feet (115 percent of
average).
================================================================================================================================== POWDER & TONGUE RIVER BASINS Streamflow Forecasts - June 1, 1999 ================================================================================================================================== | <<====== Drier ====== Future Conditions ======= Wetter =====>> | | | Forecast Point Forecast | ==================== Chance Of Exceeding * ====================== | Period | 90% 70% | 50% (Most Probable) | 30% 10% | 30-Yr Avg. | (1000AF) (1000AF) | (1000AF) (% AVG.) | (1000AF) (1000AF) | (1000AF) ====================================================================|=======================|===================================== TONGUE RIVER nr Dayton (2) JUN-SEP 54 64 | 70 91 | 76 86 77 | | MIDDLE FORK POWDER nr Barnum JUN-SEP 4.99 6.93 | 8.25 104 | 9.57 11.51 7.90 | | NORTH FORK POWDER nr Hazelton JUN-SEP 5.81 6.70 | 7.30 122 | 7.90 8.79 6.00 | | CLEAR CREEK nr Buffalo JUN-SEP 21 28 | 32 114 | 36 43 28 | | ROCK CREEK nr Buffalo JUN-SEP 15.4 17.7 | 19.3 115 | 21 23 16.8 | | PINEY CREEK at Kearny JUN-SEP 28 33 | 37 115 | 40 45 32 | | ================================================================================================================================== POWDER & TONGUE RIVER BASINS | POWDER & TONGUE RIVER BASINS Reservoir Storage (1000 AF) - End of May | Watershed Snowpack Analysis - June 1, 1999 ================================================================================================================================== Usable | *** Usable Storage *** | Number This Year as % of Reservoir Capacity| This Last | Watershed of ================= | Year Year Avg | Data Sites Last Yr Average ========================================================================|========================================================= TONGUE RIVER 68.0 65.0 26.8 48.2 | UPPER TONGUE RIVER 5 855 142 | | GOOSE CREEK 1 0 118 | | CLEAR CREEK 2 2171 167 | | CRAZY WOMAN CREEK 1 0 269 | | UPPER POWDER RIVER 3 0 192 | | POWDER RIVER in WY 5 3214 174 | ================================================================================================================================== * 90%, 70%, 30%, and 10% chances of exceeding are the probabilities that the actual volume will exceed the volumes in the table. The average is computed for the 1961-1990 base period. (1) - The values listed under the 10% and 90% Chance of Exceeding are actually 5% and 95% exceedance levels. (2) - The value is natural volume - actual volume may be affected by upstream water management.